Tesla Charging says two WattEV Megachargers are operational in Oakland, California, in a post dated November 26, 2026.
NeoTeo also covered Tesla Charging’s separate Megacharger announcement in Mesquite, Texas.
A depot’s charging capacity and its truck count answer different questions: how many vehicles can charge, and how many are in the fleet.
What charging capacity does the Oakland depot report?
FreightWaves and Drive Tesla Canada report two depot configurations: up to 25 medium- and heavy-duty trucks at up to 240 kW each, or up to seven trucks at 1.2 MW each (FreightWaves; Drive Tesla Canada).
| Simultaneous trucks | Reported power per truck |
| Up to 25 medium- and heavy-duty trucks | Up to 240 kW |
| Up to 7 trucks | 1.2 MW |
WattEV’s stated target is a megawatt-charging stop of 30 minutes or less. Drive Tesla Canada also reported that WattEV’s first Tesla Semis had entered service at the depot (Drive Tesla Canada).
How many Tesla Semis are planned for Oakland?
BASENOR reported that WattEV received its first Tesla Semis on November 24, 2026, and described a 370-truck total order, with more than 300 allocated to Oakland. It reported that the first 50 trucks were scheduled to begin arriving in 2026 and that the full fleet was expected to be operational by the end of 2027. FreightWaves described a planned 300-truck purchase for the port (BASENOR; FreightWaves).