On November 15, 2026, Vulcan’s LV-01 flight suffered an anomaly about ten minutes after liftoff and did not deliver its planned 40 Amazon Leo satellites to orbit, Gizmodo reported. Amazon had identified the flight as Leo Vulcan 1, the first Amazon Leo mission aboard Vulcan.
What happened to the LV-01 payload?
Gizmodo’s November 17 report said ULA had begun an investigation and the cause of the anomaly was unknown at that time. The flight’s reported outcome was that its 40-satellite payload was not delivered to orbit.
How LV-01 fit Amazon’s launch plan
Amazon planned LV-01 with a shortened, optimized Centaur V upper stage and six boosters. Its pre-launch notice also described a contract with ULA covering 38 launches to carry more than 1,500 first-generation Leo satellites.
Amazon said its Cape Canaveral vertical integration facility and mobile launch platform were intended to let ULA prepare two Vulcan missions at once and reduce turnaround between launches to days or weeks.
Amazon’s plan paired a specific rocket configuration with ground facilities intended to shorten the time between launches.
What do the satellite counts measure?
Amazon’s production milestone and the reported orbital count refer to different stages of the constellation’s deployment.
Amazon said it completed its 1,000th satellite in early September 2026. Gizmodo separately reported that 398 Amazon satellites had reached orbit on other vehicles before LV-01.